….I think it is DONE!

Our house is now officially complete! We thought it was a bit touch and go there over the last few days…especially with a public holiday in the way. Some things on the list were not quite finished, last time round, and a few things were not quite right (all minor I might add!) but our SS has come through with the goods as we had hoped!

Thuy and I both had the day off today to finish packing, and to organise some stuff from Bunnings for the new place. We went to the house early this morning to measure up the courtyard and alfresco for dirt and paving etc. We were amazed when we arrived to see now less than 7 or 8 vehicles parked all around our house! Plumbers, electricians, air con guys, painters, tank guys you name it they were there. It was a pretty crazy half our when we were there, with so much happening. We did our best to stay out of everyone’s way, pretty much keeping to ourselves and doing our outdoor planning. Our poor SS was looking a little under pressure (hopefully not from us!) with his phone going off every 5 minutes. I know I’ve said it before, but a really big thumbs up and thanks to him for getting our house done and looking great.

Without further delay… here are some long awaited pictures of our NEW home! :)

 
Thuy in the kitchen
 

Thuy in the kitchen

 
Bathroom 2
 

Bathroom 2

 
Out to alfresco
 

Out to alfresco

 
Theatre room door open...
 

Theatre room door open…

 
Theatre room door closed...
 

Theatre room door closed…

 
Theatre room door half open (or half closed?)...
 

Theatre room door half open (or half closed?)…

 
Prep room
 

Prep room

 
Shiney new ovens!
 

Shiney new ovens!

 
Down the main hall
 

Down the main hall

 
Ensuite basins
 

Ensuite basins

 
Ensuite
 

Ensuite

 
Tank, hot water, air con
 

Tank, hot water, air con

 
Kitchen fully installed!
 

Kitchen fully installed!

 
Action central!
 

Action central!

 
That's one way to get a tank in the yard!
 

That’s one way to get a tank in the yard!

On Monday our new lounge arrives, our driveway and decks are being built, and later in the week our blinds should be being installed. Perfect timing! Of course, the only people to NOT have their act together are Telstra. Apparently the whole estate won’t have phone connections until the 21st…. which is pretty bad considering we have neighbours that moved in nearly a month ago now!


I actually didn’t think it would be that hard to find a cartoon of an octopus wearing pants! Anyway… wasn’t really worth the effort… WORST PUN EVER!!

WOW!

Ok, well anyway…. we have on Occupancy Permit!! WOOT! This means our house is officially suitable for living in! Now all we need is the bank to go look at it and give it a rubber stamp, and then our second inspection, and then settlement and then move in!!

I reckon 2 weeks from now and we’ll be in! Fingers crossed!! We’ll be going by the block tonight to see our completed fence :D Yay!

We dropped by the house last night, not to see the house this time, but to see the fence! We got a call from “u need a fence”, it turns out that they were doing Lot 1’s fence this week and asked if we were happy to have ours done this week too!! Why not, I say!!

 
Fencing started
 

Fencing started

 
Thuy forgot her shoes...
 

Thuy forgot her shoes…

 
Telephone, gas, termite protection all installed!
 

Telephone, gas, termite protection all installed!

 
Portico render finished...looking lovely!
 

Portico render finished…looking lovely!

The only potential issue we had was that there was still quite a bit of concrete and mess out the back of the block that was awaiting clean up. We mentioned this to the fencer, and as it turns out he knows our SS. So he got on the phone and got that organised, and got the OK to build the fence early as well! So, as we speak, our fence is probably just about done (it was just posts yesterday).

Also yesterday, MCSConnect came out and dug our phone cable. So that’s another one we can tick off the list!

AND, all the way around our house we now have some “termaguard” thing which apparently stops termites from lunching on our woodwork.

On top of all that, we had a peek in the windows and it looks like the painters have been back and redone the couple of patches that need doing. So that’s another bit of good news! We’re not sure when our 2nd inspection will be, but hopefully soon! With the fence all done, we won’t actually be able to get into our yard to peek in the windows anymore!! :D

Right now I should be writing a post about how excellent our inspection was, but alas it has been moved to Friday. Certainly not a big deal for us, they’re a month and a half early anyway!! Apparently they needed to redo some of the paint which meant delaying the cleaner, which means now we’ll do the inspection Friday arvo. We’re still really looking forward to it! If all goes well we should be able to finalise everything next week. It’s scary to think we could be moved in in only a couple of weeks!

We don’t expect there will be much to pick on though, the place was looking pretty nice last time we saw it, and our SS has been doing a great job of making sure everything is finished off nicely. Fingers crossed! :)

This post is actually a bit behind schedule. Thuy and I have both been a bit sick lately. I just got over one cold and jumped straight into another one. Thuy would yell at me if she knew I was even posting right now!

Well, let’s jump straight into the good news! We received an email from Urbanedge today letting us know that our first inspection date is on the 15th of October! The news was a great birthday present for Thuy! We figure we’ll be good to move in in the first week of November if all goes well! We’re definitely at the last mile now!

It’s good to have a time frame, as now we can finalise our fencing, drive way, decking and blinds! Yay!

I have some photos here from a few weeks ago, as well as some “through the window” photos taken over the weekend. As I said, I’ve been a bit slack at updating the blog lately!

 
Before the site cleanup :)
 

Before the site cleanup :)

 
Laundry all finished
 

Laundry all finished

 
Main bathroom shower
 

Main bathroom shower

 
Control for heating/cooling ducts
 

Control for heating/cooling ducts

 
Our non-standard tapware (Thuy is very happy!)
 

Our non-standard tapware (Thuy is very happy!)

 
Basin with taps
 

Basin with taps

 
The dunny!
 

The dunny!

And the most recent photos from last week (through the windows)

 
No more temporary fencing!
 

No more temporary fencing!

 
Through the back window to the lounge, waiting for carpet.
 

Through the back window to the lounge, waiting for carpet.

 
Ensuite bath
 

Ensuite bath

 
The big ensuite mirror installed! Looks awesome!
 

The big ensuite mirror installed! Looks awesome!

I really feel sorry for the guy who is doing the tiling in our house. Our tiles are 300mm square, and we have about 100sqm of tiled floor space. That works out to be over 1100 tiles throughout our house….not including showers and the like. The poor guy has been tiling for a week now, but he says he’s just about done…. but i tell you what…tough gig! Once he’s done with our place, he has to go off and tile Lot 1 and Lot 12! EEK!

I really have to hand it to these guys. They really do put in a lot of hard work. It’s easy to forget how much work goes into building a house. Especially when you’re just walking through or perhaps visiting a display. It’s been great each week to actually see these guys hard at it as it just helps you appreciate the attention and effort that goes into something which we usually take for granted every day we walk around our house.

We’re still waiting on a handover date… but we’re hoping it’s not too far away. We have fences, decks, curtains, blinds and a driveway we want to get moving on…but everyone always asks the same question…. “when is your handover date?”. BAH! Hopefully we’ll find out tomorrow, because then we can spend the weekend getting the rest of this stuff organised.

Photo time! It’s all looking a bit messy in the photos. A lot of dust and stuff everywhere…but once it is has had a bit of a spring clean it will look lovely!

 
Master Ensuite
 

Master Ensuite

 
Main bathroom shower
 

Main bathroom shower

 
prep room
 

prep room

 
kitchen almost complete
 

kitchen almost complete

 
kitchen looking proper flash
 

kitchen looking proper flash

 
laundry tiles
 

laundry tiles

 
main hallway
 

main hallway

Well the excitement never stops at Lot number 3! It’s hard to believe that we could be any more excited than we were last week…. but… we are!

We were lucky enough to drop in whilst our Site Supervisor was there… and even though we hadn’t made an appointment to see him (which we’re supposed to…sorry!) he was kind enough to show us a around the place and point out a few of the things that we may not have noticed that have been done. I must say, I’m very impressed with how thorough he is! He pointed out a number of things that he has personally seen to being changed and/or fixed. It’s nice to know that someone who has our best interests in mind is looking after our place! So a big thumbs up to him!

We had a couple of questions about some very minor issues, and he was more than happy to see to them being rectified. To be honest, it’s been pretty hard to find anything wrong with the place at all…..and believe me I’ve been trying!

So anyway… it’s hard to believe, but since last time we dropped by, the painter has finished, the tiler is in and tiling splash backs, the electician is in and doing power, lights, TV etc, our basins are installed, the stone benchtops have all been installed, the garage door to the backyard has had locks put on it, the render has had another coat and is ready for colour AND we now have a garage door!

All this since Saturday! There would be more photos, but we felt a bit too much like tourists with the site supervisor there :D

 
Garage, now with rollerdoor
 

Garage, now with rollerdoor

 
Freshly painted front door
 

Freshly painted front door

 
roller door...huzzah!
 

roller door…huzzah!

 
TILES!!!
 

TILES!!!

 
SINKS AND BENCHTOPS!!!
 

SINKS AND BENCHTOPS!!!

 
ZOMG... it looks like a kitchen!
 

ZOMG… it looks like a kitchen!

 
Ensuite basins and benches
 

Ensuite basins and benches

 
ensuite basins
 

ensuite basins

 
Inside the much loved WIR
 

Inside the much loved WIR

These guys certainly don’t mess around. The painters look like they’re almost done already! The ceiling is all done and the walls look like they need another coat (maybe two?). All the woodwork has had the enamel gloss done as well. This week apparently the tilers will be in, which will mean most of the floors and wet areas should be done pretty soon!

Probably the biggest change this week wasn’t actually in our house, but in the main road!

 
Trees!
 

Trees!

Inside the place is looking much more like a house! White paint is so much nicer than plaster board!

 
WIR to bdrm and ensuite
 

WIR to bdrm and ensuite

 
back door
 

back door

 
bathroom being waterproofed
 

bathroom being waterproofed

 
garage painted. foam for fills
 

garage painted. foam for fills

 
nice glossy enamel
 

nice glossy enamel

 
Render half done
 

Render half done

 
lounge looking significantly whiter
 

lounge looking significantly whiter

 
Theatre room
 

Theatre room

 
Bathroom looking a little nice
 

Bathroom looking a little nice

If painting and tiling is finished this week, which may be wishful thinking, we’d then be down to electrical/carpets/appliances left! Wow!


(I realised that I’d been forgetting to my stupid images up!)

I couldn’t resist, so I had to go out and meet our cabinets! Now I’m back with photos! :D

Cabinets, benches, built in robes, vanities etc are all in. Unfortunately the painters are already in and have covered most of the stuff on plastic, including all the windows :)

 
I think Thuy likes her new WIR
 

I think Thuy likes her new WIR

 
Shiny new kitchen!
 

Shiny new kitchen!

 
The kitchen
 

The kitchen

 
Island bench cabinets
 

Island bench cabinets

 
Laundry sink
 

Laundry sink

 
Laundry
 

Laundry

 
Prep room (or cellar :P)
 

Prep room (or cellar :P)

 
Pot drawers!
 

Pot drawers!

 
Kitchen again
 

Kitchen again

 
Ensuite vanity, sans sinks.
 

Ensuite vanity, sans sinks.

The place looks like something out of E.T. or some sort of Ebola virus movie…. :shock: :lol:

 
Looks like the decontamination unit has been in
 

Looks like the decontamination unit has been in

The step up for the theatre room has also made an appearance since last time we were there.

 
Theatre room step
 

Theatre room step

Also, looks like they’re getting ready to do the render. The corners of the brickwork all have a metal strip running the height of the wall, and there is a heap of foam in the garage for the few infills that require it (the garage, alfresco and lounge windows).

 
Portico waiting render
 

Portico waiting render

Just as we were leaving the waterproofing guy turned up to paint blue stuff all over our bathrooms as well :)

No they haven’t finished fixing stage :) Someone from Urbanedge has us confused with number 1.

Such a shame!!

Oh well… they’ve made good progress anyway, besides…. we thought fixing stage being complete was too good to be true!

Here are a HEAP of photos :)

 
Fully bricked
 

Fully bricked

 
Cupboards, skirtingboards and architraves
 

Cupboards, skirtingboards and architraves

 
Big ass garage
 

Big ass garage

 
alfresco waiting for render
 

alfresco waiting for render

 
rear windows waiting for render
 

rear windows waiting for render

 
Alfresco from other side
 

Alfresco from other side

 
Rear of house (can finally get there without gumboots)
 

Rear of house (can finally get there without gumboots)

 
Looking from lounge to dining/kitchen
 

Looking from lounge to dining/kitchen

 
Kitchen
 

Kitchen

 
From kitchen to alfresco
 

From kitchen to alfresco

 
From dining to lounge
 

From dining to lounge

 
Hall cupboards and front door...nice colour!
 

Hall cupboards and front door…nice colour!

 
Bedroom doors
 

Bedroom doors

We’re expecting cupboards and vanities this week :)