This post is actually a bit behind schedule. Thuy and I have both been a bit sick lately. I just got over one cold and jumped straight into another one. Thuy would yell at me if she knew I was even posting right now!

Well, let’s jump straight into the good news! We received an email from Urbanedge today letting us know that our first inspection date is on the 15th of October! The news was a great birthday present for Thuy! We figure we’ll be good to move in in the first week of November if all goes well! We’re definitely at the last mile now!

It’s good to have a time frame, as now we can finalise our fencing, drive way, decking and blinds! Yay!

I have some photos here from a few weeks ago, as well as some “through the window” photos taken over the weekend. As I said, I’ve been a bit slack at updating the blog lately!

 
Before the site cleanup :)
 

Before the site cleanup :)

 
Laundry all finished
 

Laundry all finished

 
Main bathroom shower
 

Main bathroom shower

 
Control for heating/cooling ducts
 

Control for heating/cooling ducts

 
Our non-standard tapware (Thuy is very happy!)
 

Our non-standard tapware (Thuy is very happy!)

 
Basin with taps
 

Basin with taps

 
The dunny!
 

The dunny!

And the most recent photos from last week (through the windows)

 
No more temporary fencing!
 

No more temporary fencing!

 
Through the back window to the lounge, waiting for carpet.
 

Through the back window to the lounge, waiting for carpet.

 
Ensuite bath
 

Ensuite bath

 
The big ensuite mirror installed! Looks awesome!
 

The big ensuite mirror installed! Looks awesome!