Well we’re now at lock up…. well, the building is locked at least. Not sure if that is the same thing! There is still some roof tiling to be completed and the bricks on the south side aren’t quite complete, but its very very close to being complete! There is a bit of water inside the building, which is never good, but we don’t think it will be a problem. It is just a result of them having not quite finished the capping on the roof, and we’ve had an awful lot of rain over the last couple of days!